Portfolio Gantt view

Every project.
One timeline.
No surprises.

Timeline is the 30,000-foot view of everything you have running. It pulls live from the other BPM OS apps — the courses, the waves, the requirements, the sprints — onto one shared Gantt, so you find the collision in August instead of the week it happens.

One-time purchase. Runs locally or on a server behind your firewall. Your portfolio, your files. No subscription, no cloud, no IT ticket.

The problem

Everyone can see their project.
Nobody can see the program.

The steering committee slide, rebuilt every month

Someone spends a day pulling dates out of four tools into PowerPoint. By the time it is presented it is already wrong, and next month the whole exercise repeats.

Collisions found far too late

The migration cutover lands in the same fortnight as the training rollout and the compliance audit. Everyone knew their own dates. Nobody was looking at all three together.

Tools built for construction schedules

MS Project and its descendants assume resource leveling, critical paths, and a full-time planner. You need six workstreams on one page, not a schedule optimization engine.

A portfolio view that is stale the moment it is made

Because it was copied by hand, it reflects the day it was built. Anyone who changed a date afterwards is invisible until the next manual refresh.

Needs your quote

The strongest angle is a moment where two workstreams collided and nobody saw it coming — you will have lived that more than once. One or two sentences of the raw memory and I will shape it to match the other pages.

— Roland Woldt, Host, What’s Your Baseline? · EA/BPM Practitioner

the collision was always visible. just never in one place.

Screenshot slider — replace with MetaSlider shortcode

How it gets the data

It reads the other apps.
You don’t retype anything.

Timeline is the one place in BPM OS that talks to the other apps directly rather than through a file. When you open it, it asks each connected app what it has and draws the answer.

Course Flow Groundwork Workplan Foundation Sprint Shortlist

Live, not imported

There is no sync step and no copy of the data to go stale. Change a date in Course Flow and it is on the Gantt the next time Timeline loads.

Changes go back the other way

Move a bar on the Gantt and Timeline writes the new start date, end date, or owner back to the app that owns it. The portfolio view is not read-only, and it never becomes a second version of the truth.

You choose the sources per project

A Timeline project can pull from every connected app or only the ones you name. A board for the leadership team does not have to show the same detail as the one you keep for yourself.

Anything outside BPM OS comes in by CSV

Work that lives in another system is not left off the picture. Import it from a spreadsheet and it sits on the same Gantt as everything else.

What people use it for

One view.
Several different conversations.

Leadership

The steering committee update

Export the current picture as an image and drop it into the deck. Next month, regenerate it in seconds instead of rebuilding it by hand.

“The slide takes a minute now, and it is right because nobody retyped it.”

Planning

Finding the collision early

Overlapping phases stack into separate lanes automatically, so two things landing in the same fortnight are visible as soon as the dates exist.

“Three workstreams all needed the same two weeks in October. We saw it in July.”

Program management

Rescheduling in one place

Move the bar, and the date lands back in the app that owns the work. No parallel plan to keep in step with reality.

“I move it on the Gantt, and Course Flow has the new date. There is no second plan.”

Delivery

Requirements through to sprints

Foundation, Sprint, and Workplan on one axis, so the requirement, the sprint that delivers it, and the content migration behind it all line up in time.

“The dependency between the migration and the release was obvious once they were on the same row.”

Consulting

The client-facing plan

Brand it with the client’s colors, export the snapshot, and hand over a picture they can read without you narrating it.

“One page that answered every question the sponsor had been asking in email.”

Ownership

Who is committed to what

Every entry carries an owner, so an overloaded person shows up as a pattern on the chart rather than as a surprise in a status meeting.

“Two of her four commitments overlapped. That was a conversation, not an escalation.”

How it works

Four building blocks.

Programs

The top-level grouping. A program collects the work that belongs to one initiative, whichever app it actually lives in.

Phases

The bars on the chart. Each has a start date, an end date, and a progress percentage, and phases that overlap in time stack into separate lanes automatically so none of them hide behind another.

Milestones

Single-date markers for the things that are events rather than durations — a go-live, a gate, a board review.

Dependencies

Draw the link between two pieces of work so that “this cannot start until that finishes” is on the picture instead of in someone’s head.

Features

Built for the conversation
with leadership.

Three zoom levels

Week for the next sprint, month for the quarter, quarter for the year. Same data, three distances.

  • Week, month, and quarter scales
  • Zoom state remembered per project
  • Drag to reschedule at any zoom level

Automatic lane stacking

You never arrange rows by hand. Phases that overlap in time are pushed into separate lanes; ones that do not share a lane.

  • Overlaps become visible without being arranged
  • Non-overlapping work stays compact on one row
  • Recalculates whenever a date changes

CSV in, CSV out

Bring in anything that is not in BPM OS, and take the whole set of entries back out again.

  • Import columns: name, start date, end date, progress, group, and owner
  • Downloadable template so the format is never a guess
  • Export all entries as CSV

Export the snapshot

The output is a picture a steering committee reads in thirty seconds without narration.

  • Export the Gantt as a PNG image
  • Drop it straight into a deck or a report
  • Regenerate next month in seconds

Hide what does not belong

Not every item from a connected app belongs in a leadership view. Hide the ones that do not, without deleting anything at the source.

  • Hide individual entries from the chart
  • The source app is never modified by hiding
  • Per-project source selection for coarser control

Access control and branding

Give stakeholders the picture without giving them the ability to move it.

  • Viewer, editor, and admin roles
  • Your organization’s or client’s logo and colors
  • Optional git version history

Who it’s for

Anyone who has to answer
“where are we?”

Program & BPM managers

  • One picture that spans every workstream you are accountable for
  • Spot the collision while there is still time to move something
  • Stop rebuilding the same status slide every month
  • Reschedule once, in one place, and have it stick

EA & IT architects

  • Runs on your own machine or an internal server, with nothing leaving your environment
  • Reads other BPM OS apps over your own network, never an external service
  • Plain files on disk, with no proprietary portfolio format
  • Optional git history for the whole portfolio

Consultants

  • Give a client sponsor a portfolio view they can read without a walkthrough
  • Brand it with the client’s logo and colors
  • Bring non-BPM-OS work in by CSV so the picture is complete
  • One purchase, used across every engagement

Why local first

Your portfolio lives
where you decide.

01

No subscription, no per-seat fees

Portfolio and PPM tools charge per planner, per month, indefinitely. Timeline is part of a one-time purchase, and the number of people looking at the chart does not change the price.

02

Your program plan is not in a vendor’s cloud

For many organizations the portfolio is the single most sensitive artifact in the program — it shows what is late. It stays on your infrastructure.

03

The apps talk over your own network

Timeline reaches the other BPM OS apps directly, on the machine or server they are already running on. Nothing is routed through anyone else.

04

No vendor dependency for the plan

Every project is a plain file on disk. Open it, archive it, or back it up by copying the folder.

Compared to MS Project or a PPM tool

MS Project and the portfolio suites are built for a planning function — resource leveling, critical path analysis, baselining, and a person whose job is to maintain the plan. If you have that person, use those tools.

Most BPM and EA programs do not. They have someone who already has a day job and needs one honest picture of what is running and what collides. Timeline is built for that person, and it gets its data from the apps where the work already lives rather than asking anyone to maintain a second plan.

It does not do resource leveling, cost tracking, or earned value. It does phases, milestones, dependencies, owners, and progress, across every app in the platform, on one page.

Pricing

Part of BPM OS.

Every BPM OS license is a one-time purchase, starting at $99. No subscription, no per-seat fees, and nothing that stops working if you never buy from us again.

Timeline is included in more than one bundle. The pricing page shows which bundle fits the work you are doing, and what is in each one.

Running BPM OS across client engagements? The Consulting Edition covers commercial use, white-label branding, and client handover. Get in touch.

Common questions

Things people ask
before they buy.

Course Flow, Groundwork, Workplan, Foundation, Sprint, and Shortlist. Each one exposes its dated work to Timeline, and Timeline draws whatever it finds. You can also restrict a Timeline project to only the apps you name, so a leadership view does not have to carry the same detail as your own.

Yes. Timeline writes the new start date, end date, or owner back to the app that owns the item. This is deliberate — a portfolio view that only reads becomes a second version of the plan within a week, and then nobody knows which one is true.

Yes, by CSV import. The columns are name, start date, end date, progress percentage, group, and owner, and there is a downloadable template so the format is never a guess. Imported entries sit on the same chart as everything else.

There are three scales: week, month, and quarter. Quarter is the one you use for a year-ahead view in front of leadership; week is for the immediate horizon. The zoom level is remembered per project.

No. Phases that overlap in time are pushed into separate lanes automatically, and phases that do not overlap share a lane to keep the chart compact. That means an overlap is something you discover rather than something you have to lay out to notice.

Export the Gantt as a PNG and drop it into your deck. You can also export every entry as CSV if someone wants the underlying numbers rather than the picture.

Yes. Run BPM OS on a shared server and give them the viewer password — they see the full chart but cannot move anything. Editors can reschedule, and only admins reach the settings.

Not if you need resource leveling, cost tracking, or earned value — Timeline does none of those. It is a replacement for the PowerPoint portfolio slide that someone rebuilds by hand every month, which in most BPM and EA programs is what MS Project was actually being used to produce.

Stop rebuilding
the status slide.

Every program already has the dates. Timeline is what puts them on one page, keeps them current, and shows you the collision while there is still time to do something about it.

Part of the BPM OS from What’s Your Baseline?